# A roof at Moss Stop — complete text alternative

Whole source-defined relationships, names and date jobs. No staff worked answer or prefilled learner response is printed. Entirely made-up bus stop. Committee record M1, 2011: waiting passengers had asked for cover because rain reached their waiting seats. Work record M2, 2012: designer Uma drew a roof plan; builders erected that roof over the existing seats in response to M1. Driver record M3, 2013: on one wet morning she saw three passengers waiting under the roof. A passenger's note M4 says “My seat was dry that morning.” No survey of all passengers, all-weather test or later condition is included. Reading order is top to bottom. No meaning relies on colour. This is original broad line art of supplied fictional records, not a photograph, measured plan or current site.

## M1 /2011

Passengers asked for cover because rain reached their waiting seats.

## M2 /2012

Uma drew the roof plan; builders erected the roof over existing seats in response to M1.

## M3 /2013

Driver reports seeing three passengers under the roof on one wet morning.

## M4 /same morning

One passenger says “My seat was dry that morning.”

## Complete source

Entirely made-up bus stop. Committee record M1, 2011: waiting passengers had asked for cover because rain reached their waiting seats. Work record M2, 2012: designer Uma drew a roof plan; builders erected that roof over the existing seats in response to M1. Driver record M3, 2013: on one wet morning she saw three passengers waiting under the roof. A passenger's note M4 says “My seat was dry that morning.” No survey of all passengers, all-weather test or later condition is included.

[Whole editable SVG](B-first-source.svg) · [Aid menu](INDEX.html).

[Sources and reuse](../SOURCE-NOTICE.html). Original educational work © NeuroForgeIO Pty Ltd 2026, CC BY 4.0.
