SubjectNest resource library

Development draft · local review needed

Day 14 · A method another team could repeat · AC9S9I01 · AC9S9I02Year 9 Inquiry · T1 W3–4 · Day 14 lesson

Prepare this lesson

Year 9 / Integrated / Term 1 / Weeks 03 04

Part of the full two-week lesson sequence. Check the pack guide and taught point before teaching.

Open for this lesson: Pack guide · Fresh learner checks · Aids and text routes.

Download full sequence

Teacher copy: This page may include teaching prompts or answer keys. Answer keys in this public library can be viewed by anyone. Give learners a clean prompt, use checks as formative evidence, and change a case locally when prior access matters.

Learner prompts

Question: What would a valid small retest need to specify? Kit: Source B, retest method, paper only by default. 35 = 3 + 7 + 12 + 8 + 5.

  1. 0–3: Ask an investigable question: “For this paper and setup, how does the sensor value vary with layer count?” It is narrower than “Is the screen dependable?”
  2. 3–10: Model a protocol listing baseline/background, same paper size/batch/orientation, LED setting, fixed sensor distance/position, layer order, repeated readings, safe handling and who records. The changed variable is layer count; reading is measured. Ask whether a school permits any real equipment.
  3. 10–22: Teams write a reproducible six-step paper protocol, a blank 0–4 by three-run table and a risk/permission note. Only if approved and equipped, a supervised group may collect its own separate readings without merging them into B/D. No actual data means mark not observed.
  4. 22–30: Exchange protocols; peers locate one uncontrolled variable or ambiguous instruction and revise it. Routes: assemble large procedural cards; use tactile control/measure tokens and dictate steps; write/table a protocol or run the approved safe test. Running the test is conditional, not a requirement for the paper plan.
  5. 30–35: “Does a well-written method prove we conducted it?” Key: no. Response move: if made-up results appear, cross them out and write not observed; if controls are named but not operational, add quantities/positions.

Another domain: Plan a fictional paper-screen test for museum display illumination; no actual venue claim. Home: describe a fair test verbally; no equipment task.